在线高清不卡无码视频|人人爽人人澡人人高潮|久久久亚洲一区欧美精品|日韩成av人片在线观看|日韩欧美一区二区麻豆天美|曰本高清在线一区二区三区|中文国产成人精品久久无广告|无码久久精品国产亚洲A∨影片

Hello, welcome to Jinan Huawei CNC machinery CO., Ltd

Advanced Search:


Contact us


contact us

Contacts:JI Manager

Unified hotline:400-6587-688

Tel: (86)531-88276988

Fax:(86)531-88276988

Phone number:0086-15269186223

Address: No.18 Tonghua Road ,

Licheng district , Jinan city, 
shandong province, China



Industry news

Installation process of automobile mold machine

Source: Time:2024-02-03 09:24:42 views:

The installation process of automobile mold machine mainly includes the following steps: 1. Preparation work: Clean up the installation site, check the integrity of the equipment, and ensure that the equipment meets the safety requirements

The installation process of automobile mold machine mainly includes the following steps:

1. Preparation work: Clean up the installation site, check the integrity of the equipment, and ensure that the equipment meets the installation requirements.

2. Equipment handling: The handling equipment used transports the equipment from the factory to the installation site.

3. Equipment installation: Install the equipment according to the equipment installation drawings, including steps such as positioning, fixing, and connecting the equipment.

4. Equipment debugging: Debug the equipment to ensure that it can operate normally.

5. Equipment acceptance: The equipment supplier and user jointly conduct equipment acceptance to confirm that the equipment meets installation requirements and can operate normally.

6. Training: Provide training to users on equipment operation and maintenance to ensure that they can use and maintain the equipment correctly.

The above are the main steps of the installation process for automotive mold machines, and each step needs to be strictly carried out according to the requirements to ensure that the equipment can operate normally.

keys: